Product Description
Our factory can do these raw material Alloy No: 6061,6063,6060.
Aluminium Alloy Composition:
Chemical Composition | 6063 T5 | | | | |
Si | Fe | Cu | Mn | Mg | Zn | Ti | Cr | Others | total others |
0.2-0.6 | M.0.35 | M. 0.1 | M. 0.1 | 0.45-0.9 | M. 0.1 | M. 0.1 | M. 0.1 | M. 0.05 | 0.15 |
Mechanical property | | | | | |
Yield Strength | Tensile Strength | Extensibility | hardness | | | |
110Mpa | 160Mpa | 8% | 8 HW | | | |
Chemical Composition | 6063 T6 | | | | |
Si | Fe | Cu | Mn | Mg | Zn | Ti | Cr | Others | total others |
0.2-0.6 | M.0.35 | M. 0.1 | M. 0.1 | 0.45-0.9 | M. 0.1 | M. 0.1 | M. 0.1 | M. 0.05 | 0.15 |
Mechanical property | | | | | |
Yield Strength | Tensile Strength | Extensibility | hardness | | | |
180Mpa | 205Mpa | 8% | | | | |
Aluminium Profile Machining
CNC (Computer Numerical Control)
Punching/Drill/Tapping/Milling/Assembly
Accurate Cutting for 90° & 45° & all degree
Promise cutting tolerance : p/m 0.1mm
Aluminium profile surface treatment
short anodized for all colors
Polishing bright anodized/Matt bright anodized
Brush anodized
Electrophoresis
Anodized/Sandbalsting/Matte/Powder coated/Wooden print/Thermal break
Packaging & Shipping
EP paper inside for each piece then shrink paper. or carton paper then pallet. or wooden carton. ect
FAQ
1. Prices fob:
Need receive your draws and need surface treatment.
2. Payment terms:
30% advance payment and balance payment before the goods load into the container.
3. Handing time:
normally extrusion workshop 12hours and other workshop 9hours.
4. MOQ:
any small order quantity always best welcome.
but normally the cost for 1x40'or1x20'container order quantity are lowest cost. 40' about 20-26tons and 20'about 8-12tons.
normally if one set tooling die mould finish 3-5tons then no any die mould charge. but no problem. we will also return back the die mould money after the order quantity finish 3-5tons in 1 year.
normally one set die mould finish 300kgs then no any added machine cost.
Do not worry about that you can feel freely choose and confirm you need order quantity. anyway I will try my best supply you lowest prices.
5. Delivery time:
normally produce new die mould and sample about need 15days. 1x20'or 40'container order quantity about need 15-30days.
but we will try our best to supply you according to your need times.